Every machine leaves the workshop with a document set, not just a crate. The set is filed by serial number, so a query two years after delivery can still be answered against the original record.
What is in the document folder
A test pressure record signed at the bench (1.5× rated pressure, 30 minutes for hydraulic units), the material certificate for pressure-retaining parts, a dimension sheet for the flange pattern and bar travel, and the assembly drawing for the stack you bought.
Third-party inspection
If your project requires it, SGS, BV or TÜV can inspect before packing. Book it when the order is placed so the inspection slot falls before the crating date, not after.
After delivery
Spare cups, cutters, packing and glands are held for models we have shipped. Send the serial number and the seal compound you need; we match it against the original record.